Envirochem Offer RPE Face Fit Testing

Envirochem now offer respiratory protective equipment (RPE) fit testing.

The performance of all RPE face pieces, whether operating by negative pressure, power assistance or compressed air, relies heavily on the quality of fit to the wearer’s face. An inadequate fit will significantly reduce the protection provided by the RPE and may lead to serious health problems.

Fit testing is available on-site or at our laboratory for full-face, half-face, ori-nasal and P3 disposable masks.

The Health and Safety at Work Act 1974 requires all employers to take satisfactory precautions to protect their employees in the workplace.

Under the revised Health and Safety Executive Legislation (2002), fit test reports should be available for all employees who wear respiratory protective equipment (RPE) incorporating tight fitting face pieces. Fit test records should be retained by the employer and be available for inspection upon request.

Regulation 11 of the control of asbestos regulations (2012) states that fit testing of face pieces must be pertained for tight fitting face pieces. Repeat testing is required when changing size or model of RPE, or with significant changes in facial characteristics of the wearer. The HSE recommend that fit retesting be carried out on a regular basis, especially for workers involved in licensed asbestos removals.

To book a face fit with us or for further information please contact us below

Contact Envirochem now
Sending

Asbestos Air Monitoring

Envirochem offer a wide range of asbestos air monitoring services in accordance with HSG 248.

Our asbestos analysts are provided with fully equipped mobile laboratories allowing for on-site analysis of air samples and instant certification upon completion of analytical monitoring.

Background Air Monitoring

Background Air Monitoring is conducted to establish airborne fibre concentrations prior to any activity that may lead to airborne asbestos contamination or in specific locations with known asbestos based materials.

Leak Air Monitoring

Leak Air Monitoring is conducted outside the enclosure/work area while work is in progress. It is undertaken to verify that the control measures are adequate in controlling asbestos fibre release to the outside.

Four Stage Clearance Air Monitoring

Four stage clearance Air Monitoring is undertaken following the removal of asbestos based materials (generally notifiable materials such as insulation boards, insulation and coatings) under fully controlled conditions. This will enable a certificate of reoccupation to be issued to reassure those reoccupying the area that it is safe to do so.

Reassurance Air Monitoring

Reassurance Air Monitoring is conducted to determine asbestos fibre concentrations upon completion of the assessment of site for reoccupation. It is also undertaken after the removal of non-notifiable asbestos containing materials (such as vinyl floor tiles, cement products, textured coatings) or following the disturbance of suspected or identified asbestos containing materials.

Personal Air Monitoring

Personal Air Monitoring is conducted to assess whether or not the personal exposures of workers comply with the relevant control limits and to determine the suitability of respiratory protective equipment being used.

If you would like to enquire about any of our air monitoring services please contact us below:

Contact Envirochem now
Sending

 


Envirochem Now Offers Soil And Aggregate Grading

Envirochem are pleased to announce that we now offer a wider range of soil and aggregate grading options. These include Type 1, Type 2, Type 3, Type 4, 6F1, 6F2, 6F4 & 6F5 grading.