Four stage clearance Air Monitoring is undertaken following the removal of asbestos based materials (generally notifiable materials such as insulation boards, insulation and coatings) under fully controlled conditions. This will enable a certificate of reoccupation to be issued to reassure those reoccupying the area that it is safe to do so.
Here is one of our analysts recently on site carrying out such testing.